How to Get Rid of 9,000 Tons of Toxic Topsoil
The ball fields of Red Hook, Brooklyn, were built on the site of a lead-smelting plant. Decades later, the cleanup begins. [Source]
Publication Date:Origin: nytimes.com
Category: Waste Materials and Disposal
Topics: begins, cleanup, later, Decades, plant, lead-smelting, built, Brooklyn, fields, Topsoil, Toxic